Project
Siam Bioscience
Siam Bioscience Nakornpathom Project Recommend
GPSC, Nuovo Plus (2022)
Year 2022Construct new R&D and Pilot plant
for
GPSC Battery Factory
Baiya Phytopharm (2021)
Year 2021Design and construct new Pilot plant
for Covid-19 Vaccine production line
Bayer (2006-2014)
Lab expansion
Bayer (2008-2009)
New Building, PU Thin film production.
Bayer (2006-2007)
New Building, PU Thin film production.
GPO-MBP (2012)
QC Lab extension 410 m2, Clearnroom: 200 m2 of Class C, 80 m2 of BSL – 2 Virology Testing Class C
VITALO (2016)
New Building, Plastic production. Cleanroom Class 100K: 310 m2
Thai Otsuka (2008)
New I.V. Factory 7,500 m2, Cleanroom: 1,500 m2 of Class C General Electrical, BAS, Fire Protection, HVAC, Clean Dry Air, Steam, Purify Water
T-MAN (2016-2017)
New Pharmaceutical Building 13,000 m2, Cleanroom: 5,000 m2 of Grade D, 735 m2 Low Humidity area (40%RH)
Bionet Asia (2015-2016)
Supply & Install Cleanroom Grade B/C/D for B09: Building
Bionet Asia (2013-2014)
Supply & Install Cleanroom Grade D for Bio-Laboratory Facilities: HVAC system, Electrical, Cleanroom
Siam Toyota2 (2013)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
Siam Toyota (2011)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
Synergy Flavour (2012-2013)
Supply & Install Facility for Office, Flavours-Laboratory, and Flavours Production, Process Equipment Hook Up 1,800 m2
Synergy Flavor (2018)
Air condition (VRF, Spilt type)
Ventilation and Exhaust
Power supply, DB, Lighting,
Thai Meiji Pharmaceutical (2017-2019)
Crystallization and Drying room: AHU replacement
Cooling coil replacement for AHU
R&D area and Manager room renovation
Rodenstock (2015)
AHU 2-9 replacement (during new year shutdown) for plastic lenses production line New AHU, BAS, Duct work
BTP Industrial
Renovation for new Production line.
YPC
Renovation for Cleanroom Class 100K, relocation and hook up Utility for Production line (2 factory).
HOYA
RX-1, Cleanroom expansion and process equipment installation.
Rodenstock (2014)
New process cooling and warm water. Design & installation cooling and warm water for new production line
Rodenstock (2001-2017)
Renovation project, Air condition, Mechanical & Electrical
Eastern Sugar And Cane
Concept Design for GMP production layout, Process-Air condition improvement.
Carabao Tawandang
Concept and Detail Design for Process-Air condition improvement.
Covestro
Concept & Detail Design for New production line.
Baiya Phytopharm
Feasibility, URS, Concept Design for New production line (Vaccine, Bio-science)
Abinis
GMP, Validation Document develop & Support for Biological production plant.
Coats Tread
Engineering, Drawing develop.
BorgWarner (2017)
New Factory, Turbo assembly line, 6,000 sq.m. Air condition, Mechanical, Electrical, Machine hook up.
AB Food
Concept and Detail Design for Process-Air condition improvement.
YPC
New Transformer 1,250 KVA, New MDB.
Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.
Bionet-Asia
Utility improvement for filling and package line.
Akara group
Lighting for Food production line.
Ministry of Public Health
Air condition for Maternity ward and Dialysis treatment room.
Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
Crytal Design Center: CDC
Air condition improvement.
Covidien
BAS repairing work.
BorgWarner
Addition LAN, Tel, Receptacle and hook up for production line.
Kandall Gammatron (2012)
New production, Cleanroom Grade D 2,400 m2
BioNet
Packaging machine installation and Hook up.
BioNet
Modification and Machine hook up for New production line
Thai Meiji Pharmaceutical (2013-2014)
Air condition renovation for Powder production plan
Siam Bheasach (2019)
Design and Built Pharmaceutical production line Class 100, 10,000, 100,000 Cleanroom.
Rodenstock (2017-2022) (2)
Toilet Building 2 & 3 renovation
Building 3 Renovation
Lighting, Air condition
Siam Bheasach (2015-2016)
Air condition replacement for Warehouse area
Water cooled Chiller 100 Ton and new FCU for Finished product warehouse
Siam Bheasach (2015-2016)
Cream production Renovate Cleanroom Grade D 700 m2
Siam Bheasach (2014-2015)
Beta Lactam Lab Renovate Cleanroom Grade B/C/D 700 m2
Rodenstock (2017-2022) (1)
AHU 2-12 replacement (New year 2018, shutdown)
Cleanroom Building 1 Modification
Air condition for Casting room improvement
Siam Bheasach (2011-2012)
Renovate Cleanroom Grade D 2,400 m2 of Grade D, 300 m2 Low Humidity area (20%RH)
Covestro (Thailand) Ltd. Year 2018-2019
Film plant Expansion Line 3, Cleanroom Class
Siam Bheasach Siam Pharmaceutical VECON (2020-2021)
Renovate and construct Pharmaceutical production line
Siam Bheasach (2022)
Renovate and construct Pharmaceutical production line (Grade, A, B, C, D)
Zuellig Pharma (2019)
Renovate and construct Pharmaceutical Warehouse with Temperature mapping for Medical devices storage
Thai Otsuka Pharmaceutical Co., Ltd (2022)
New QC Lab
Reckitt Benckiser (2022)
Expansion New Warehouse.
Global Power Synergy Public Co., Ltd (2022)
Construct new R&D and Pilot plant for GPSC Battery Factory
BAIYA PPHYTOPHARM (2021)
BAIYA PPHYTOPHARM (2021) Bangkok Project Recommend