Synergy Flavour (2012-2013)
BangPlee, Bangkok
Supply & Install Facility for Office, Flavours-Laboratory, and Flavours Production, Process Equipment Hook Up 1,800 m2
![](http://wp.pirengineering.com/wp-content/uploads/slider/cache/9bfd77aedd8cd50291d2d500f0a44ab1/unnamed-6.jpg)
ZuelligPharma-pic01
![ZuelligPharma-pic01](http://wp.pirengineering.com/wp-content/uploads/slider/cache/f9ff7a48a15f2f3116877d368086d057/unnamed-6.jpg)
Project Recommend
![Siam Toyota2 (2013) Siam Toyota2 (2013)](http://relay.pirengineering.com/wp-content/uploads/2022/07/mnbmgh.png)
Siam Toyota2 (2013)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
![Siam Toyota (2011) Siam Toyota (2011)](http://relay.pirengineering.com/wp-content/uploads/2022/07/ncnbgdf.png)
Siam Toyota (2011)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
![Ekarat (2008-2009) Ekarat (2008-2009)](http://relay.pirengineering.com/wp-content/uploads/2022/07/dsadc.png)
Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.
![Triumph Aviation (2005) Triumph Aviation (2005)](http://relay.pirengineering.com/wp-content/uploads/2022/07/bfdfd.png)
Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
{"arrow":"true","pagination":"true","speed":"2000","autoplay":"true","autoplay_speed":"3000","loop":"true","owl_slide_to_show":"3","slide_show_ipad_owl":"2","slide_show_tablet_owl":"1","slide_show_mobile_owl":"1","owl_slide_to_scroll":"1","owl_slide_margin":"20","owl_slide_padding":"0","owl_start_slide":"0","owl_slide_center":"false","owl_slide_autowidth":"true","owl_slide_freeDrag":"false","owl_height_auto":"false","caption":false,"owl_slide_rtl":"false"}