
Global Power Synergy Public Co., Ltd (2022)
Maptaput, Rayong
Construct new R&D and Pilot plant for GPSC Battery Factory
Work scope
- Dry room (Very low humidity room, Dew point -40C)
- Air condition
- Electrical, Fire alarm, Access control, CCTV, LAN
- Cleanroom Wall & Ceiling
- Sanitary, Plumbing, Drainage system
- Fire protection






The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design






Project Recommend

Siam Toyota2 (2013)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower

Siam Toyota (2011)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower

Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.

Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
{"arrow":"true","pagination":"true","speed":"2000","autoplay":"true","autoplay_speed":"3000","loop":"true","owl_slide_to_show":"3","slide_show_ipad_owl":"2","slide_show_tablet_owl":"1","slide_show_mobile_owl":"1","owl_slide_to_scroll":"1","owl_slide_margin":"20","owl_slide_padding":"0","owl_start_slide":"0","owl_slide_center":"false","owl_slide_autowidth":"true","owl_slide_freeDrag":"false","owl_height_auto":"false","caption":false,"owl_slide_rtl":"false"}
{"animation_fancy":"","transition_fancy":"","fancy_box_loop":""}