Project

Siam Bioscience

Siam Bioscience

Siam Bioscience Nakornpathom Project Recommend
GPSC, Nuovo Plus (2022)

GPSC, Nuovo Plus (2022)

Year 2022Construct new R&D and Pilot plant for GPSC Battery Factory
Baiya Phytopharm (2021)

Baiya Phytopharm (2021)

Year 2021Design and construct new Pilot plant for Covid-19 Vaccine production line
Bayer (2006-2014)

Bayer (2006-2014)

Lab expansion
Bayer (2008-2009)

Bayer (2008-2009)

New Building, PU Thin film production.
Bayer (2006-2007)

Bayer (2006-2007)

New Building, PU Thin film production.
GPO-MBP (2012)

GPO-MBP (2012)

QC Lab extension 410 m2, Clearnroom: 200 m2 of Class C, 80 m2 of BSL – 2 Virology Testing Class C
VITALO (2016)

VITALO (2016)

New Building, Plastic production. Cleanroom Class 100K: 310 m2
Thai Otsuka (2008)

Thai Otsuka (2008)

New I.V. Factory 7,500 m2, Cleanroom: 1,500 m2 of Class C General Electrical, BAS, Fire Protection, HVAC, Clean Dry Air, Steam, Purify Water
T-MAN (2016-2017)

T-MAN (2016-2017)

New Pharmaceutical Building 13,000 m2, Cleanroom: 5,000 m2 of Grade D, 735 m2 Low Humidity area (40%RH)
Bionet Asia (2015-2016)

Bionet Asia (2015-2016)

Supply & Install Cleanroom Grade B/C/D for B09: Building
Bionet Asia (2013-2014)

Bionet Asia (2013-2014)

Supply & Install Cleanroom Grade D for Bio-Laboratory Facilities: HVAC system, Electrical, Cleanroom
Siam Toyota2 (2013)

Siam Toyota2 (2013)

Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
Siam Toyota (2011)

Siam Toyota (2011)

Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
Synergy Flavour (2012-2013)

Synergy Flavour (2012-2013)

Supply & Install Facility for Office, Flavours-Laboratory, and Flavours Production, Process Equipment Hook Up 1,800 m2
Synergy Flavor  (2018)

Synergy Flavor (2018)

Air condition (VRF, Spilt type) Ventilation and Exhaust Power supply, DB, Lighting,
Thai Meiji Pharmaceutical (2017-2019)

Thai Meiji Pharmaceutical (2017-2019)

Crystallization and Drying room: AHU replacement Cooling coil replacement for AHU R&D area and Manager room renovation
Rodenstock (2015)

Rodenstock (2015)

AHU 2-9 replacement (during new year shutdown) for plastic lenses production line New AHU, BAS, Duct work
BTP Industrial

BTP Industrial

Renovation for new Production line.
YPC

YPC

Renovation for Cleanroom Class 100K, relocation and hook up Utility for Production line (2 factory).
HOYA

HOYA

RX-1, Cleanroom expansion and process equipment installation.
Rodenstock (2014)

Rodenstock (2014)

New process cooling and warm water. Design & installation cooling and warm water for new production line
Rodenstock (2001-2017)

Rodenstock (2001-2017)

Renovation project, Air condition, Mechanical & Electrical
Eastern Sugar And Cane

Eastern Sugar And Cane

Concept Design for GMP production layout, Process-Air condition improvement.
Carabao Tawandang

Carabao Tawandang

Concept and Detail Design for Process-Air condition improvement.
Covestro

Covestro

Concept & Detail Design for New production line.
Baiya Phytopharm

Baiya Phytopharm

Feasibility, URS, Concept Design for New production line (Vaccine, Bio-science)
Abinis

Abinis

GMP, Validation Document develop & Support for Biological production plant.
Coats Tread

Coats Tread

Engineering, Drawing develop.
BorgWarner (2017)

BorgWarner (2017)

New Factory, Turbo assembly line, 6,000 sq.m. Air condition, Mechanical, Electrical, Machine hook up.
AB Food

AB Food

Concept and Detail Design for Process-Air condition improvement.
YPC

YPC

New Transformer 1,250 KVA, New MDB.
Ekarat (2008-2009)

Ekarat (2008-2009)

New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.
Bionet-Asia

Bionet-Asia

Utility improvement for filling and package line.
Akara group

Akara group

Lighting for Food production line.
Ministry of Public Health

Ministry of Public Health

Air condition for Maternity ward and Dialysis treatment room.
Triumph Aviation (2005)

Triumph Aviation (2005)

New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
Crytal Design Center: CDC

Crytal Design Center: CDC

Air condition improvement.
Covidien

Covidien

BAS repairing work.
BorgWarner

BorgWarner

Addition LAN, Tel, Receptacle and hook up for production line.
Kandall Gammatron (2012)

Kandall Gammatron (2012)

New production, Cleanroom Grade D 2,400 m2
BioNet

BioNet

Packaging machine installation and Hook up.
BioNet

BioNet

Modification and Machine hook up for New production line
Thai Meiji Pharmaceutical (2013-2014)

Thai Meiji Pharmaceutical (2013-2014)

Air condition renovation for Powder production plan
Siam Bheasach (2019)

Siam Bheasach (2019)

Design and Built Pharmaceutical production line Class 100, 10,000, 100,000 Cleanroom.
Rodenstock (2017-2022) (2)

Rodenstock (2017-2022) (2)

Toilet Building 2 & 3 renovation Building 3 Renovation Lighting, Air condition
Siam Bheasach (2015-2016)

Siam Bheasach (2015-2016)

Air condition replacement for Warehouse area Water cooled Chiller 100 Ton and new FCU for Finished product warehouse
Siam Bheasach (2015-2016)

Siam Bheasach (2015-2016)

Cream production Renovate Cleanroom Grade D 700 m2
Siam Bheasach (2014-2015)

Siam Bheasach (2014-2015)

Beta Lactam Lab Renovate Cleanroom Grade B/C/D 700 m2
Rodenstock (2017-2022) (1)

Rodenstock (2017-2022) (1)

AHU 2-12 replacement (New year 2018, shutdown) Cleanroom Building 1 Modification Air condition for Casting room improvement
Siam Bheasach (2011-2012)

Siam Bheasach (2011-2012)

Renovate Cleanroom Grade D 2,400 m2 of Grade D, 300 m2 Low Humidity area (20%RH)
Covestro (Thailand) Ltd. Year 2018-2019

Covestro (Thailand) Ltd. Year 2018-2019

Film plant Expansion Line 3, Cleanroom Class
Siam Bheasach Siam Pharmaceutical VECON (2020-2021)

Siam Bheasach Siam Pharmaceutical VECON (2020-2021)

Renovate and construct Pharmaceutical production line
Siam Bheasach (2022)

Siam Bheasach (2022)

Renovate and construct Pharmaceutical production line (Grade, A, B, C, D)
Zuellig Pharma (2019)

Zuellig Pharma (2019)

Renovate and construct Pharmaceutical Warehouse with Temperature mapping for Medical devices storage
Reckitt Benckiser (2022)

Reckitt Benckiser (2022)

Expansion New Warehouse.
Global Power Synergy Public Co., Ltd (2022)

Global Power Synergy Public Co., Ltd (2022)

Construct new R&D and Pilot plant for GPSC Battery Factory
BAIYA PPHYTOPHARM (2021)

BAIYA PPHYTOPHARM (2021)

BAIYA PPHYTOPHARM (2021) Bangkok Project Recommend