Baiya Phytopharm (2021)
Bangkok
Year 2021Design and construct new Pilot plant
for Covid-19 Vaccine production line
Work scope
- (Grade D) Cleanroom
- HVAC, Air condition, Cold room
- Purify water (PW), CO2 gas
- Electrical, Fire alarm, Access control,
CCTV, LAN - Cleanroom Wall & Ceiling
- Cleanroom equipment (Pass box, etc)
- Process machine hook up
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
Project Reccommend
GPO-MBP (2012)
QC Lab extension 410 m2, Clearnroom: 200 m2 of Class C, 80 m2 of BSL – 2 Virology Testing Class C
Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.
Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
{"arrow":"true","pagination":"true","speed":"2000","autoplay":"true","autoplay_speed":"3000","loop":"true","owl_slide_to_show":"3","slide_show_ipad_owl":"2","slide_show_tablet_owl":"1","slide_show_mobile_owl":"1","owl_slide_to_scroll":"1","owl_slide_margin":"20","owl_slide_padding":"0","owl_start_slide":"0","owl_slide_center":"false","owl_slide_autowidth":"true","owl_slide_freeDrag":"false","owl_height_auto":"false","caption":false,"owl_slide_rtl":"false"}