BAIYA PHYTOPHARM

Baiya Phytopharm (2021)

Bangkok

Year 2021Design and construct new Pilot plant
for Covid-19 Vaccine production line

Work scope

  • (Grade D) Cleanroom
  • HVAC, Air condition, Cold room
  • Purify water  (PW), CO2 gas
  • Electrical, Fire alarm, Access control,
    CCTV, LAN
  • Cleanroom Wall & Ceiling
  • Cleanroom equipment (Pass box, etc)
  • Process machine hook up 
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
previous arrow
next arrow

Project Reccommend

{"arrow":"true","pagination":"true","speed":"2000","autoplay":"true","autoplay_speed":"3000","loop":"true","owl_slide_to_show":"3","slide_show_ipad_owl":"2","slide_show_tablet_owl":"1","slide_show_mobile_owl":"1","owl_slide_to_scroll":"1","owl_slide_margin":"20","owl_slide_padding":"0","owl_start_slide":"0","owl_slide_center":"false","owl_slide_autowidth":"true","owl_slide_freeDrag":"false","owl_height_auto":"false","caption":false,"owl_slide_rtl":"false"}
{"animation_fancy":"","transition_fancy":"","fancy_box_loop":""}